1 | (1) | (a) | ship under 10 gross tonnes | 1 |
| | (b) | ship 10 gross tonnes or more but under 50 gross tonnes | 2 |
| | (c) | ship 50 gross tonnes or more but under 150 gross tonnes | 2.5 |
| | (d) | ship 150 gross tonnes or more but under 500 gross tonnes | 2.5 |
| | (e) | ship over 500 gross tonnes or more | 2.5 |
| (2) | Additional fee if ship intended to carry more than 40 passengers — for each unit of 40 passengers or any lesser number | 0.5 |
2 | Semi-annual sight survey | |
| (a) | ship under 10 gross tonnes | 1 |
| (b) | ship 10 gross tonnes or more but under 50 gross tonnes | 2 |
| (c) | ship 50 gross tonnes or more but under 150 gross tonnes | 2.5 |
| (d) | ship 150 gross tonnes or more but under 500 gross tonnes | 2.5 |
| (e) | ship 500 gross tonnes or more | 2.5 |
3 | Annual survey-afloat | |
| (a) | ship under 10 gross tonnes | 2 |
| (b) | ship 10 gross tonnes or more but under 50 gross tonnes | 3 |
| (c) | ship 50 gross tonnes or more but under 150 gross tonnes | 6 |
| (d) | ship 150 gross tonnes or more but under 500 gross tonnes | 8 |
| (e) | ship 500 gross tonnes or more | 10 |
4 | Annual survey-on slip | |
| (a) | ship under 10 gross tonnes | 3 |
| (b) | ship 10 gross tonnes or more but under 50 tonnes | 6 |
| (c) | ship 50 gross tonnes or more but under 150 gross tonnes | 8 |
| (d) | ship 150 gross tonnes or more but under 500 tonnes | 12 |
| (e) | ship 500 gross tonnes or more (This fee includes an initial sighting of the hull immediately when the ship is hauled out of the water at the discretion of the surveyor if requested by the owner of the ship) | 16 |
5 | Four year survey-on slip | |
| (a) | ship under 10 gross tonnes | 4 |
| (b) | ship 10 gross tonnes or more but under 50 gross tonnes | 8 |
| (c) | ship 50 gross tonnes or more but under 150 gross tonnes | 10 |
| (d) | ship 150 gross tonnes or more but under 500 gross tonnes | 15 |
| (e) | ship 500 gross tonnes or more | 20 |
6 | Special survey | 1 |
7 | Extension sight survey | |
| To extend a safety survey certificate for a period not exceeding one month when permitted in special circumstances — half the time indicated in Item 2 (semi-annual sight survey) | |
8 | Survey of lifeboat equipment | |
| (a) | boat certified to carry less than 40 people | 2.5 |
| (b) | boat certified to carry 40 people or more | 3 |
9 | Buoyancy test of lifejacket | |
| Per 6 life jackets (or any less number to be tested) | 1 |
10 | Design approval of a lifejacket | |
| (a) | Visual check of a sample model and perusal of a test report from an approved Standards Institute or Maritime Safety Department | 2 |
| (b) | Stamping jackets with an approval stamp of the Fiji Marine Board — per 10 jackets (or any less number to be stamped) | 1 |
11 | Compass adjusting — per compass on ship— | |
| (a) | under 10 gross registered tonnes | 1 |
| (b) | 10 gross registered tonnes but less than 50 | 1.5 |
| (c) | 50 gross registered tonnes or more | 2 |
12 | Issuing towing permit (Not to be issued unless towing ship has a valid seagoing certificate) | |
| (a) | special survey of ship being towed to be carried out (Item 6) if ship does not have a seagoing certificate | As per Item 6 |
| (b) | approval of towing arrangement of each ship and of towline | 2 |
| (c) | approval of tow master’s voyage plan | 0.5 |